
Got an idea this morning to cut a diagonal line across the slab allowing the concrete to settle back in place. Nothing to lose i guess.

Frost heaving was minimal this year from the appearance. No cracks that are apparent so the insulation and reinforcing must have worked. March 18- I have come to the conclusion that this was not frost. It's the #### clay soil. It appears that it takes more than a year to settle disturbed clay. Might need to go. A save is possible it we can tip it back in place and pour some dead men on the low side. Next month?