Monday, October 6, 2008

Percussive Calibration


What the ?


Tails


Greasy Weird Guy


Teacher Talk


View from the inside


Crew Chief On Site


Making Progress


First Roof Panel On The Way


Three Up


Broken Ear Replaced


Sentinel Structures Quality


South Beam #2


South Beam


It started raining yesterday afternoon about 4:00 p.m. and didn't quit until this morning after we started working. The Elite crew arrived early to a soggy mess with the crane shortly after. Work started with the setting of the beams and finished with roof panels on the North and South partitions. It took a little time for the crew to get everything rolling smoothly but once they got going it went well. Credit goes to the the crane operator, the Elite Boys and a good sledge hammer. Thanks!

Preparing the large beams


7:00 a.m. Crane with first ceiling beam


Friday, October 3, 2008

Ready for the roof panels

North side. Kitchen window, window seat near fireplace in living room. West side of house is front. All ceilings are vaulted.

Entry looking into the kitchen


From the front bedroom through the bathroom to bedroom


Looking from the front bedroom into the hallway


Looking from the living room toward the bathroom



F

From living room looking toward fron door


Latest pictures Friday October 3

Here are the pictures that I took tonight. The sun was about to go down so I was shooting fast.

Last picture yesterday


Sorting out all the panels and staging


Those are the awning windows up in the vaulted ceiling


Looking north to south


This is the bathroom bedroom side


Progress


Front panels


Close up of a panel


The house is going up so fast that I can't keep up with the latest pictures. These are the pictures as of yesterday. I just went over to the site and "walked in my house!" The wall panels are all in and it looks like they are ready to do some roof stuff next week. I will take more pictures tomorrow.
My first impression is, "There is a lot of glass!" The window and door openings look so big. I'm sure when the windows and doors go in that they will look different. The views are tremendous-lots of fall colors showing in Wisconsin!
Many people have come by-even the fire chief. He had seen a house go up on TV similar to ours and he had thought to himself that his crew should learn how to fight a fire in this kind of situation. And then, he drives by our house, and there it is in New Holstein. He took pictures and wants to come over and do more.
I like what I see so far and it is much easier for me to figure things out when there is more than one dimension! How I can be the sister of an architect and not be able to visualize this house is a mystery to Peter and Brandon our builder!

Thursday, October 2, 2008

Floorplan?


Recap of What Is Being Built


So, that higher panel...is that on the front of the house? Is it on the left or right? My guess is looking at the picture that it is the front left hand side of the house. So the kitchen is in front of the living room and the thing popped out of the side of the house is in the living room.

Hey! Maybe you can take some pictures of the magazine pictures of the inside of the house?! Or a picture of the big floorplans?

Wednesday, October 1, 2008

And what have you been doing all morning?


This is not the question to ask a construction worker. And, I won't tell you what his answer was.

This is almost the end and out of nails


Crew Chief


Andrea was kept busy "gophering" and keeping the site tidy and gathering the crooked nails.

Backing up a bit


Monday and Tuesday we were busy finishing the deck and cleaning up before the house panels arrived.

Brandon and the Elite Builders


The Beginning


The panels are numbered and each one is mapped on the plan. This is panel number one. Hurray!

Second Tier of Panels


Peter and I had to take the trailer back to Andy in Marinette. This is what they were doing as we sped away!

Elite Builders of Green Bay


Russ, the truck driver


Panels stacked all over the yard


Close up of the panels


The forklift unloading more panels


Peter said, "I think we need to go eat lunch!" None of them took a tumble, but it was windy and fun. They really knew what they were doing.

Getting ready to unload


These are the panels


No wasted space at all! It was amazing to see how they placed the panels on the truck and scarey to watch them unload them.

Here comes the truck from South Dakota


The crane unloading the beams


The beams arrived from Sentinel Structures